Contract No. 6/WSD/11
Construction of Water Supply System to Housing Development at Anderson Road
The works include
a) construction of a fresh water pumping station at Sau Mau Ping Road with a pumping capacity of 22,000 m3 per day;
b) construction of a fresh water service reservoir at Anderson Road with a capacity of 12,000 m3;
c) construction of a salt water service reservoir at Anderson Road with a capacity of 2,800 m3;
d) laying of approximately 2 km of fresh and salt water mains with sizes ranging from 300 mm to 900 mm in diameter;
e) installation of additional salt water pumps with a pumping capacity of 5,200 m3 per day in the existing Shum Wan Shan salt water pumping station;
f) installation of additional fresh water pumps with a pumping capacity of 22,000 m3 per day in the existing Shum Wan Shan fresh water pumping station; and
g) ancillary works including greening works.